
ENERGY CONSERVATIONALBERTA PACIFIC FOREST INDUSTRIESBoyle, ABInstall lazy steam injector06/008787Partial discharge analysis(high voltag…
ENERGY CONSERVATION
ALBERTA PACIFIC FOREST INDUSTRIES
Boyle, AB
Install lazy steam injector | 06/00 | 87 | 87 |
Partial discharge analysis
(high voltage equipment) | 06/00 | 30 | 30 | |
Power generation metering | 06/00 | 25 | 25 | |
CET breaker overload analyzer | 05/00 | 10 | 10 | |
Total | 152 | 152 |
ALLIANCE FOREST PRODUCTS INC.
Donnacona, QC
Misc. | 110 | 110 |
CANADIAN FOREST PRODUCTS
Intercontinental Pulp,
Prince George, BC
Install cogeneration system | 06/00 | 7160 | 4325 |
CASCADES INC.
Brantford, ON
Water reduction & recycling project | 05/00 | 20 | 20 |
East Angus, QC
Boiler #8 control pannel | 12/00 | 80 | 80 | |
Energy management system phase 1 | 12/00 | 20 | 20 | |
Total | 100 | 100 |
DOMTAR
Espanola, ON
Misc. | 12/02 | 280 | 280 |
FLETCHER CHALLENGE
Crofton, BC
Reclaim effluent heat | 10/01 | 1000 | 500 | |
Mechanical seals | 05/01 | 600 | 300 | |
Total | 1600 | 800 |
KRUGER INC.
Corner Brook, NF
Modify hydraulic turbine | 950 | 760 |
MARATHON PULP
Marathon, ON
Power monitoring system | 03/00 | 20 | 20 | |
No. 3 TG inspection and overhaul | 05/00 | 430 | 430 | |
150 steam vent | 05/00 | 157 | 157 | |
Recommission No. 1 turbo generator | 12/00 | 2232 | 2232 | |
Total | 2839 | 2839 |
POPE & TALBOT Inc.
Harmac Operations
Nanaimo, BC
Heat recovery | 1674 | 1477 |
QUESNEL RIVER PULP COMPANY
Quesnel, BC
Heat recovery & effluent cooling | 08/00 | 150 | 150 |
ST. LAURENT PAPERBOARD
La Tuque, QC
Reduce freshwater | 12/00 | 200 | 200 | |
Improve boilers & recovery | 09/00 | 3000 | 3000 | |
Replace thermo compressors | 10/00 | 1400 | 1400 | |
Total | 4600 | 4600 |
STORA ENSO
Port Hawkesbury, ON
Misc. | 12/00 | 500 | 500 |
TEMBEC
Skookumchuck, BC
Cogeneration | 06/01 | 43000 | 8000 |
AV Cell Inc.
Altholville, NB
Misc. | 12/00 | 1150 | 1150 |
Smooth Rock Falls Division
Smooth Rock Falls, ON
Automate power house | 09/00 | 1000 | 1000 | |
Install G5/G6 | 12/01 | 1700 | 1300 | |
Total | 2700 | 2300 |
Spruce Falls
Kapuskasing, ON
PM 1,3,4 Warm water gen | . | 12/01 | 2075 | 1575 |
TOLKO MANITOBA KRAFT PAPERS
The Pas, MN
Utilities monitoring | 09/00 | 110 | 110 |
Print this page